Local Dalestie Area, Service

VoltVista Electric

  • Dalestie
  • 10(102 reviews)

Electrical Repairs Installation of Lighting Fixtures Rewiring Fuse Box Upgrades Appliance Installation Power Outlet Installation Ceiling Fan Installation Security System Wiring Data and Networking Wiring Emergency Electrical Services Home Automation Installation Electrical Inspections Electrical Consultations Generator Installation Outdoor Electrical Work

Dalestie

UK

How Long Does It Take to Install an EV Charger?

The installation time for an EV (Electric Vehicle) charger can vary depending on several factors, including the complexity of the installation, the type of charger, and any required electrical upgrades. Here's a comprehensive overview of the factors that influence the installation time and what you can generally expect.

Factors Influencing Installation Time

  1. Type of EV Charger
    • Slow Chargers (3.6 kW): These are generally simpler to install and require less time.
    • Fast Chargers (7 kW to 22 kW): The most common for residential installations, these may require additional time depending on electrical requirements.
    • Rapid Chargers (43 kW and above): Typically used for commercial settings; these installations are more complex and time-consuming.
  2. Electrical System Assessment
    • Existing Electrical Capacity: If the existing electrical panel has sufficient capacity and spare circuit breaker slots, the installation will be quicker.
    • Electrical Upgrades: If upgrading the electrical panel or installing a new circuit is necessary, this will add time to the installation process.
  3. Site Conditions
    • Proximity to Electrical Panel: Installations closer to the main electrical panel are generally quicker. More distant locations require additional cabling, which takes more time.
    • Mounting Surface: Installing the charger on an easily accessible wall or mounting post can speed up the process. Complex mounting conditions or outdoor installations may take longer.
  4. Permits and Approvals
    • DNO Approval: For high-powered chargers, approval from the local Distribution Network Operator (DNO) may be required, potentially delaying the installation.
    • Building Regulations Compliance: Ensuring compliance with Part P of the Building Regulations and obtaining necessary permits might add some additional time.

Typical Installation Timeline

  1. Initial Assessment and Preparation
    • Site Survey: Typically takes about 1-2 hours. The electrician assesses the electrical system, potential installation site, and any necessary upgrades.
    • Quoting and Permits: Getting a quote and applying for any required permits can take from a few days to a couple of weeks, depending on local regulations and DNO approval.
  2. Installation Process

1.                   Simple Installation

      • Duration: 2-4 hours.
      • Specifics: For installations where the charger is close to the electrical panel, the electrical system has sufficient capacity, and no complex cabling or mounting is required.

2.                   Typical Residential Installation

    • Duration: 4-8 hours.
    • Specifics: Includes installing a dedicated circuit, potential small upgrades to the electrical panel, and standard cabling and connections.

3.                   Complex Installation

      • Duration: 1-2 days.
      • Specifics: For installations requiring significant electrical upgrades, longer cabling runs, or complex mounting conditions.

Steps Involved in Installation

  1. Electrical System Evaluation
    • Capacity Check: The electrician evaluates whether the main service panel can handle the additional load from the EV charger.
    • Upgrades: If necessary, they will plan and execute upgrades to the electrical system to ensure safety and compliance.
  2. Mounting the Charger
    • Wall or Post Installation: Securely mounting the charger to a wall or dedicated post, ensuring it is easily accessible and properly positioned.
    • Weatherproofing: For outdoor installations, ensuring the charger is weatherproof and properly sealed.
  3. Wiring and Connections
    • Running Cables: Running electrical cables from the main panel to the charger, making all necessary connections.
    • Circuit Breaker Installation: Installing a dedicated circuit and appropriate circuit breakers to protect the installation.
    • Earthing and Bonding: Ensuring proper earthing and bonding to enhance safety.
  4. Testing and Commissioning
    • Safety Tests: Performing necessary safety tests to ensure the charger is functioning correctly and safely. This includes checking grounding, insulation resistance, and RCD functionality.
    • System Commissioning: Final checks and commissioning of the charger.
  5. Certification
    • Electrical Installation Certificate (EIC): Providing necessary certification to confirm that the installation complies with safety standards and regulations.

Conclusion

The time required to install an EV charger can vary widely depending on several factors, including the type of charger, the complexity of the installation, and the condition of the existing electrical system. On average, a straightforward residential installation can take between 2 to 8 hours, while more complex installations may require up to 1-2 days. Initial assessments, potential upgrades, and obtaining necessary permits may also add to the total timeline. Ensuring the installation is carried out by a qualified electrician ensures safety, compliance, and optimal performance of the EV charger.